Sediment Controls

Proper erosion and sedimentation controls must be in place prior to any construction activity to prevent sediment or silt run-off. Sediment (including cement) should never be rinsed off the site; instead it must be cleaned up using dry cleanup methods or in a manner that does not allow any material to reach a storm drain or waterway. Equipment tires should be rinsed before leaving the site if necessary to avoid tracking sediment into the roadway or off the site. All erosion and sediment controls are to be maintained throughout the duration of the construction and maintained until all areas are stabilized.

Learn more about what we do at iThemes.

iThemes.com