Sampling and Analysis

storm-water-sampling-analysisStormwater Sampling and Analysis

Greater Bay Area Environmental will perform all required stormwater sampling and analysis requirements. Greater Bay Area Environmental will arrive on the construction site, take the required samples, and have them analyzed. Results usually take one to three days depending on the constituent:

•      pH
•      Turbidity

Non-storm Water Discharge

In the event of a non-storm water discharge, sampling will be necessary to determine the extent of contamination. A suite of constituents will be sampled if suspected non-visible pollutants are discharging. The constituents are posted below:

•      Oil & Grease
•      Total Dissolved Solids
•      Nitrate
•      pH
•      BOD (Biological Oxygen Demand)